Auto Union update

It is winter time again - which means the Auto Union is being worked on again.

During the month of May the following tasks have been completed.

   •   the custom made radiator has been plumbed in with purpose built water pipes
   •   a floor has been created, along with side panels
   •   a start has been made on welding up the chassis

   •   the front suspension arm have been fabricated (see photo below)

auto union1

auto union

auto union2

 frnt suspension